


AUTONEUM
FEBRUARY 2017 - JULY 2020

Comprehensive intervention in electrical and control systems to strengthen operations in the mining and industrial environment.
Challenge
Ensure operational continuity during the 2020 scheduled shutdown and reinforce the reliability of electrical, control and instrumentation systems in critical areas (dry, wet and electrolysis), exposed to highly corrosive conditions and high energy demand.
Solution
Execution of specialized maintenance to control and instrumentation systems in all operational areas.
Comprehensive service for UPS systems, including lead-acid battery analysis, technical diagnosis, detailed report and battery replacement to ensure reliable power backup.
Installation of 200 meters of fiber optic cable for strategic connection with the contracts office.
Pipe renewal, wiring and connection to rotary valves to optimize performance and operational safety.
Implementation of lighting, power and control systems for a new sulfuric acid tank in an electrolytic zinc mine, using DRB Domex specifications with anti-corrosive PVC coating.
Supply and installation of lightning protection and lighting system in arsenic chimney, including civil works, lightning rod delta, wiring to chimney tip, installation of dipole tip and strobe lights.
Result
Strengthened electrical and control infrastructure, greater reliability in critical systems, protection against corrosive environments, and significant improvement in operational safety and continuity of the industrial process.
