TERMINAL OF THE CENTER OF MEXICO OCTOBER 2018 - OCTOBER 2019
Medium and low voltage electrical system.
We installed the electrical system from the medium-voltage service entrance to transformers, low-voltage panels, control panels, motor control centers, connection of loading and unloading pumps, grounding system, lightning protection system, outdoor lighting, HVAC systems, and instrument connections.


Instrumentation system, automation and control.
Manufacturing, installation, and connection of control cabinets, PLCs, and installation of measurement instruments (pressure transmitters, level transmitters, densitometers, temperature transmitters, and motorized valves).
Fiber optics, CCTV and structured cabling.
Installation of approximately 4–6 km of fiber optic infrastructure, fiber splicing through core fusion, assembly and connection of a data center, and implementation of photovoltaic panel systems to power a wireless network and CCTV on poles located along railway tracks.