NATIONAL PAPER PRODUCER DECEMBER 2019 - JUNE 2020
Electric
-
Winder Machine: Connection to a 2000 kVA transformer to a disconnect switch supplying a motor control center for the paper winder. Installation of CED 40 aluminum conduit and grounding system.
-
Paper Machine: Installation and connection to new low-voltage motor drives. Renewal of piping and cabling for motor power supply.
-
Lighting: Engineering development, installation, and commissioning of an LED lighting system within the paper machine area under extreme humidity and heat conditions.
-
Transformers: Electrical cabling from the medium-voltage primary side (15 kV) to the drivers’ room at low voltage.
-
Motors: Commissioning of medium-voltage motors at 4160 V, including cabling, conduit installations, and VLF testing.
-
MCCs: Assembly, installation, connection, and commissioning of motor control centers.
Automation, control and networks
-
Winder Machine: Installation of conduit, cabling, and connections for the winder control system.
-
Paper Machine: Installation and connection to new low-voltage motor drives, including renewal of piping and cabling for motor control.
-
Fiber Optics: Installation of 500 meters of outdoor fiber optic cable on cable trays and connection through core fusion splicing to communicate with the electrical network analyzer.