top of page



Draxton / Gisederlan
2023–2024
Comprehensive electrical development in high-demand industrial plants.
Challenge
Ensuring a reliable and certified electrical infrastructure to support continuous operation and high-consumption machinery in industrial plants in San Luis Potosí.
Solution
Execution of the electrical power supply project, medium and low voltage distribution, lighting and channeling to equipment and motors at the Draxton Plant.
Comprehensive development of the electrical system at the Gisederlan plant: power supply, substations, MV/LV distribution, switchboards, connections, documentation, testing and certification.
Result
Tested and certified electrical systems, greater operational stability and energy capacity ready for industrial growth.


bottom of page